[LEAPSECS] Meeting with Wayne Whyte
michael.deckers
michael.deckers at yahoo.com
Thu Feb 3 03:58:21 EST 2011
On 2011-02-03 08:04, Steve Allen wrote:
> However, this suggestion of increasing the limit of DUT1 should
> go hand in hand with another change made in Rec. 460. The original
> draft of 460 which was presented to the CCIR Plenary Assembly
> suggested that the leaps should be full seconds or "integral
> multiples thereof".
>
Very interesting, thanks! The "double leap second" resurfaced
in the ISO standard for C in 1989.
> Somehow during the discussions at the Plenary Assembly the phrase
> in quotes was deleted before adoption of the draft recommendation.
They probably realized that |TAI - UTC| < 1 s excludes multiple
leap seconds.
Michael Deckers.
More information about the LEAPSECS
mailing list