Boaz and Irving (dare I say Mutt and Jeff?)
NW Mailing List
nw-mailing-list at nwhs.org
Tue Aug 7 21:10:44 EDT 2007
Frank,
Thanks for the info. I'll have to dig out my copy of Mercedes. I know
where Taylor's Mountain is and always thought, when driving 460, that there
appeared to be a bit of a hump there.
Sam
----- Original Message -----
From: "NW Mailing List" <nw-mailing-list at nwhs.org>
To: "NW Mailing List" <nw-mailing-list at nwhs.org>
Sent: Tuesday, August 07, 2007 1:45 AM
Subject: Re: Boaz and Irving (dare I say Mutt and Jeff?)
> Jimmy: Thanks for the Railfan reference re Boaz.
>
> Sam: If you have access to Ed King's A--Mercedes of Steam, go to p. 147,
> which pictures Y6 2148, in reverse, pushing a WB mixed freight East of
> Montvale. I know the spot well: it is immediately off the western slope
> of Taylor's Mountain, a finger roughly perpendicular from the Blue Ridge
> chain, playing out at Irving. Westbound crews opting not to chance a
> stall on the way to Buford's Gap just East of Blue Ridge would pick up
> their pusher at Irving. There was a mild WB 0.6 grade, half-mile-plus
> climb from the Irving siding to the high point on the Taylor's Mountain
> stretch, followed by an approximately 1.5 mile, 0.5 grade downhill run
> which the head-end engine and pusher alike would exploit to the full
> preparatory to hitting the roughly six-mile climb, starting about a mile
> East of Montvale, to Buford's Gap. For both head- end engine and pusher
> to get full benefit of that downhill break, pushers had to connect at
> Irving. Precisely, I conclude, No. 2148's story in the photo.
>
> No. 2148 doubtless began working that day from Boaz; instead of returning
> light to Boaz following the Blue Ridge climb, as many (probably most) Boaz
> pushers did, No. 2148 continued all the way to Irving (some nine miles
> ahead) to await there the call for a WB shove. The Irving siding almost
> certainly saw far less traffic (no coal drags) than Boaz. But there it
> was for WB over-Blue Ridge calls as needed. I believe I have read an
> account of even celebrity A-1218 in her working days stalling out WB to
> Blue Ridge and needing help, having earlier passed up the prudent choice,
> given her tonnage that day, at Irving.
>
> I might add: When in the mid-'50s the N&W began aggregating EB
> 200-or-more coal consists at Montvale (from Y+A head-end, Y pusher
> 150-load (approximately) over-Blue Ridge runs, which picked up some 50
> fill loads from an earlier Montvale Turn), what lay straight ahead, with
> little head-start time? Taylor's Mountain! Not in the the same league
> with the 1.2 Blue Ridge grade EB, but mighty pushing and hauling all the
> same for the 2+1 team departing full stop from Montvale, to face little
> get-up-momentum time for Taylor's Mountain. Once over the western slope
> of Taylor's Mountain, pushers would disconnect and run the short distance
> to Irving. At the crossover, depending upon traffic needs, the pushers
> would hole up at the Irving siding or head WB light.
>
> For a piece on the Irving siding, see The Arrow, v.15, n.5.
>
> Frank Gibson
>
>
>
>
> ________________________________________
> NW-Mailing-List at nwhs.org
> To change your subscription go to
> http://list.nwhs.org/mailman/options/nw-mailing-list
> Browse the NW-Mailing-List archives at
> http://list.nwhs.org/pipermail/nw-mailing-list/
More information about the NW-Mailing-List
mailing list