1904 Dry Fork Extension is Let to Contract
NW Mailing List
nw-mailing-list at nwhs.org
Fri Aug 31 10:01:10 EDT 2007
Bluefield Daily Telegraph
November 16, 1904
---------------------------------
After postment several times the Dry Fork Extension of the Norfolk and
Western
Railway was let to contract last Saturday to the following firms. J.W.
Oliver
and Company get the upper fifteen miles and the last fifteen is divided
between
Lane Brothers, Walton, Witten & Graham and Boxley and Company. This new
line will use the roadbed of what is now the Iaeger-Southern its length,
five miles,
but it will be reconstructed, many change being made, as this road when
built was
expected to be temporary and not permanent. Work will begin on the
construction
of this railway at once and be pushed to completion. It will traverse one
of the richest
coal fields in the state, which owing to the greater territiory, may in a
few years exceed
the production of the Elkhorn field and its branches. The new field that
this route will
develop does not commence proper untill above Perryville, which for many
years was
the county seat of McDowell.
The junction of the new line will be at Iaeger, twenty three miles west of
Welch, and will
extend into Tazewell County, going to the town of Pocahontas, a distance
from Iaeger
of fifty-five miles, the survey for the entire line having already been
made. It is predicted
by those who are familar with the situation that this will eventually be
the main line and that
the road which is now the main line through the Elkhorn field will be
numbered with the
numerous branches of thsi great railway system.
There will be a numbe rof branches from this new line, four of which are
already contemplated.
Only one tunnel will be necessary in its construction and it will be within
five miles of Iaeger, and
only 400 feet long.
----------------------------------------------------------
Alex Schust
More information about the NW-Mailing-List
mailing list