Passenger schedules
NW Mailing List
nw-mailing-list at nwhs.org
Mon Oct 26 07:05:01 EDT 2009
A test report at the archives indicates that N&W was interested in operating economy when considering raising the J's boiler pressure from 275 psi to 300 psi. There was a measurable savings in coal and water per unit of output at the higher pressure.
Dave Stephenson
More information about the NW-Mailing-List
mailing list