Milepost differences - "Miles from ---"
NW Mailing List
nw-mailing-list at nwhs.org
Wed Nov 23 16:41:12 EST 2022
Field Notebooks
There are about 100 boxes of Field Notebooks at the NWHS Archives with each box containing an average of 70 Field Notebooks of 40 pages each or about 280,000 pages. They are leather covered books, titled on the front and numbered, and every book I have looked at is covered with coal dust. We have inventoried 10 of the boxes or about 700 books as to their contents. I have included the inventory for Box 4 and Box 10 as examples of what can be found in the Banker Boxes. With respect to Box 10 Line P is the Pocahontas Div main line and P-XX is a branch line or a line not part of the original main line such as Book BB-00010.01 Book 12 of the Pocahontas Div Chain Survey, Line P-11, Westbound through Cooper tunnel, Station 0 to Station 101+30.8 or 10,138.8 feet.
The sample field notebook page (image 2014) is from Book BB-00010.11 Book 27. The page is read from the bottom to the top. Page 26 is from the survey on October 11, 1916 and shows concrete MP N380 at Station 996+94. The end of the short 213.5 foot siding to the right, which serviced the Switchback power plant is at Station 998 +22 and the inference is the east wall of the 16 foot arch is at Station 999+76. Other pages are more specific as to where the east and walls of culverts and bridges are measured.
Louie Newton told me some years ago that building survey stations were taken at the east corner of the building. Bridges were measured at the back of the east west walls to establish the length of the bridge. Page 29 from Book 27 (image 2017) shows that measurement for the Watchman’s shanty at Switchback and that it is located 40 feet from the eastbound track. The tank locations are measured from the tank centerline and located to the right of the track.
Image 2003 is page 23 from Book 28 on October 17, 1916. Note the weather as rain in the upper right. Sometimes these notations will include the initials of the survey team who that were listed in the cover page of the notebook. Note the location of the switch to the Delta Branch at Station 1026+93.5. Also note the detail on the Lick Branch store and the fact there was no siding there in October 1916.
These are just to illustrate some of the points Abram was making in his email, and to encourage someone to take on the task of inventorying the other 90 Banker Boxes of field notebooks.
Alex Schust
From: NW-Mailing-List [mailto:nw-mailing-list-bounces at nwhs.org] On Behalf Of NW Mailing List
Sent: Tuesday, November 22, 2022 11:20 PM
To: N&W Mailing List
Subject: RE: Milepost differences - "Miles from ---"
Here is something the Gang might like to know, viz. at what point is the mileage taken for stations and named places on the railroad? E.g. when a mile + tenths is specified for, say, Elliston or Wharncliffe, at what point do those numbers apply?
Standard railroad engineering practice, in the early days, was to use the Center Line of the depot building of Tower as the mileage for that station. In cases where there was no structure, the mileage was often given at the "P.S." (Point-of-Switch.) Since field surveys were chained in tents of a foot from the beginning point, it was easy to come up with the decimals. Once the depot buildings and Towers began disappearing, things became a bit more subjective.
How about an Interlocking... How are mileages for those obtained? If there were a Tower, the MP + tents for it would be used. A perfect example of a long interlocking is Singer, between Salem and Elliston. The distance between the opposing Home Signals is just a tad shy of 1,000 feet, and there is no tower or depot. At Randolph Street Interlocking in Roanoke, the interlocking limits were about 3500 feet long (before the changes of a half-dozen years ago.) In such cases, the footage measurement is most usually made to the "central instrument house" (i.e. signal case.) In instances of extremely long interlockings (I know of one which is just short of a mile in length,) the distance is taken from the "principle" central instrument case of the several which may be used, i.e. the one where the interlocking apparatus is interfaced with the control wires leading in.
Another thing to know is that many railroads took elevations as part of their chain surveys. The backwalls of the principal bridges, and either a window sill or one of the stone stairs of a depot building would have a bronze bolt driven in, containing a line cut across the head with a chisel. Elevations were taken at these markers, and recorded in the field survey leather-bound notebooks. In the case of the construction of the Transcontinental Railroad (opened in 1869,) the Army Corps of Engineers did all the chain surveys (both footages and elevations).... largely to keep the railroads from lying about how much railroad they had built` and collecting unwarranted subsidies from the Federal Treasury.
The field surveyors' notebooks of many railroads often have an entry something like this on their first page: "Field survey begun 8:30 AM, April 1, 1907, at <location>, temperature 46 degrees, light rain. Begun at a bronze bolt driven in the west backwall of the XXX River Bridge, XX feet above mean high water. Chained along north rail. Survey party consisted of (name) Transit, (name) Book, (name) and (name) Chainmen." Sometimes the Axemen (brush cutters) would also be listed. When a train showed up, they stopped their chaining and removed their equipment from the track, and chalk-marked the wen of the rail at the point where they had ceased working.
The Valuation Maps and subsequent engineering documents all took their dimensions from these field survey books. And I will bet the Norfolk Southern has many feet of them on shelves in the Chief Engineer's library room, all lined up and numbered. The railroads thought they would be here forever, and they engineered accordingly.
I believe it may have been the Chief Train Dispatcher of each N&W Division who was tasked with keeping the Time Table up to date. And no doubt, when the CTD needed a Mile Post + tenths for a Time Table or Train Sheet revision, he walked down the hall to the Division Engineer's Office and asked one of the Draughtsmen for the data.
All this stuff which is now long-forgotten, and nobody even thinks about the problems, issues and practices any more.
-- abram burnett
150 gr. Controlled Chaos Turnips
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20221123/2e2a9ef7/attachment-0001.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: NWHS Field Books Box 4 June 2012.xls
Type: application/vnd.ms-excel
Size: 45568 bytes
Desc: not available
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20221123/2e2a9ef7/attachment-0001.xls>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: NWHS Field Books Box 10 October 2015.xlsx
Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
Size: 18537 bytes
Desc: not available
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20221123/2e2a9ef7/attachment-0001.xlsx>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: APS )CT 5 2022014.jpg
Type: image/jpeg
Size: 625458 bytes
Desc: not available
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20221123/2e2a9ef7/attachment-0003.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: APS )CT 5 2022017.jpg
Type: image/jpeg
Size: 608437 bytes
Desc: not available
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20221123/2e2a9ef7/attachment-0004.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: APS )CT 5 2022003.jpg
Type: image/jpeg
Size: 1421227 bytes
Desc: not available
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20221123/2e2a9ef7/attachment-0005.jpg>
More information about the NW-Mailing-List
mailing list