Switchback Mine Run on Elkhorn Branch ca.1940s
NW Mailing List
nw-mailing-list at nwhs.org
Fri Apr 14 13:27:29 EDT 2023
Grant
To me everything on the Pocahontas Div. leaves me confused. I would
never say ever even for a Y.
I have got one for you. Crozer Store siding a few miles west of
Elkhorn, Switchback, Angle or Lick Branch. Do you recall if any
passenger trains stopped at this location by flag etc to pick up or
discharge paying customers. We have a very good photo of this store and
would bet it was non time table station stop for some trains. Never can
think to check this out when at the archives.
Jim
On 4/14/2023 11:11 AM, NW Mailing List wrote:
> Jim,
>
> Alex questioned the existence of a wye at the junction in Maybeury and
> did a great job of proving a negative, leaving me unable to find the
> evidence I thought I had.
>
> Grant Carpenter
>
> On 4/24/2022 11:02 AM, NW Mailing List wrote:
>> Jim,
>>
>> In this period leading up to the Elkhorn realignment, other changes
>> were occurring: tipples closed, traffic changed, Traffic Control
>> expanded and so forth. I'm not sure of the chronological order of
>> details here and most will relate to the run's last years.
>>
>> Based at Eckman Yard, the Switchback Mine Run was a day job that
>> worked the main line east from Keystone up to Switchback. Regular
>> motive power was the Class Y3 No. 2005, dispatched facing
>> upgrade/east. Empties for the branch were picked up en route at
>> Morgan, about two miles west of Switchback. Westbound Elkhorn jobs
>> would set off empties there on two storage tracks next to the
>> westbound main. The mine run could access them via a local,
>> hand-thrown crossover from the eastbound and would couple them ahead
>> of the 2005.
>>
>> At one train a day, the junction at Switchback didn't rate a
>> signal--just a hand-thrown, facing-point switch on the eastbound
>> main. Like the local crossover at Morgan, the switch had an electric
>> lock that was controlled by the operator at Bluestone Tower.
>> Permission was sought by phone in a line-side box at the junction.
>> Another line-side box held a register book for the conductor to
>> register on the branch and off when leaving.
>>
>> Empties were shoved around the tipple(s) to the delivery tracks
>> beyond, then loads were pulled from below and blocked for east and
>> west. Tonnage declined as the three old mines on the branch were
>> worked out. According to Alex in /Billion Dollar Coalfield/, Shamokin
>> Colliery closed in 1941 and Elkhorn Colliery in 1944, leaving Angle
>> (Norfolk) Colliery to hang on into the 1950s. I believe the third leg
>> of the wye through downtown Maybeury was taken up before the wye you
>> mentioned at Elkhorn Colliery, so closing Elkhorn removed any means
>> of turning the 2005. Backing out to return home might have reduced
>> tractive effort, but that was offset by the decline in tonnage. Also,
>> there was the speed restriction for backing moves, but that was
>> raised in later years.
>>
>> Then there was the lack of signaling both at the junction and on the
>> main. To come off the branch headed west on the eastbound main with
>> no westward signals was slow running. Later, bidirectional TC would
>> help, but that was somewhat offset when the Powhatan Arrow began
>> service. Depending on the schedule, the mains cleared for Nos. 25 and
>> 26 to meet in this area every mid-afternoon. This was on top of the
>> base load of traffic. For example, before the relocation reduced it,
>> the eastbound ruling grade was two percent, so heavy eastbounds were
>> shorter, more frequent, and rated both pushers and helpers on short
>> cycles (i.e., slow eastbounds and lots of westbound light moves). At
>> least with extras, operators could hold traffic windows open during
>> the day for local jobs to work.
>>
>> After getting permission from Bluestone, coming out onto the
>> eastbound main set the mine run up to proceed west to the Crozer
>> tipple across the main from Morgan. From the eastbound main, east
>> loads were set off in the tipple's runaround for pickup by eastbound
>> Elkhorn crews. West loads were then shoved across the local crossover
>> to the storage tracks at Morgan where the empties had been pulled
>> earlier. Westbound Elkhorn and (later) River crews forwarded the
>> loads to Eckman/Kimball and Williamson, respectively.
>>
>> If the eastbound main was busy, Crozer was skipped and the east loads
>> went on to Eckman. If the westbound was busy, Morgan was skipped and
>> the west loads went to Eckman. If time got tight on both mains, the
>> Eckman operator tried to keep the Powhatan Middle Track open for them
>> to clear up.
>>
>> Edits and questions are welcome--I hope this helps.
>>
>> Grant Carpenter
>>
>> On 4/18/2022 8:35 AM, NW Mailing List wrote:
>>> Does anybody have any insight into operations at Switchback prior to
>>> the late '40s realignment? Coal loads would have to be rounded up
>>> from the Angle branch, Shamokin and Elkhorn and then brought up to
>>> the main West of the power house. But how was the traffic
>>> controlled? I haven't seen any photos showing signals to stop
>>> either mainline or mine movements. How did they insure the main was
>>> clear when they came up? Also, if they "pulled" up from the bottom,
>>> the movement would be pointed West. Where did they go for
>>> assembly? Did everything go West to Byrd at North Fork or even on
>>> to Ecklmann? Any and all thoughts will be appreciated. Not to name
>>> names, but I'm hoping Mr. Grant might chime in on this one and
>>> perhaps Professor Schust.
>>> Thanks,
>>> Jim Cochran
>>
>
>
> ________________________________________
> NW-Mailing-List at nwhs.org
> To change your subscription go to
> http://list.nwhs.org/mailman/options/nw-mailing-list
> Browse the NW-Mailing-List archives at
> http://list.nwhs.org/pipermail/nw-mailing-list/
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20230414/678b5b29/attachment-0001.htm>
More information about the NW-Mailing-List
mailing list