<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=iso-8859-1">
<META content="MSHTML 6.00.6000.16809" name=GENERATOR>
<STYLE></STYLE>
</HEAD>
<BODY bgColor=#ffffff>
<DIV><FONT face="Trebuchet MS">Bluefield Daily Telegraph<BR>April 21, 
1909</FONT></DIV>
<DIV>&nbsp;</DIV>
<DIV align=center><FONT size=4>VIRGINIAN TAKES ANOTHER STRIDE 
WESTWARD</FONT></DIV>
<DIV align=center>------</DIV>
<DIV align=center><STRONG>Enters Into Arrangement to Run Trains Over Chesapeake 
and Ohio Tracks to St. Albans</STRONG></DIV>
<DIV align=left>&nbsp;</DIV>
<DIV align=left>&nbsp;&nbsp;&nbsp; The Virginian Railway has taken another 
stride westward.</DIV>
<DIV align=left>&nbsp;&nbsp;&nbsp; It is announced from the general offices at 
Norfolk that an arrangement has been effected with the Chesapeake and Ohio 
Railway through which the Virginian trains will, not later than May 15th, run 
over the Chesapeake and Ohio tracks to St. Albans.</DIV>
<DIV align=left>&nbsp;&nbsp;&nbsp; St. Albans is twelve miles west of Charleston 
and forty-four miles west of Deepwater, the recent junction point of the 
Virginian and the Chesapeake and Ohio.&nbsp; Under the new arrangement the 
Virginian trains will go through Charleston and on to St. Albans.&nbsp; The 
reason for their going to the last named station is that there are turn tables 
there and facilities for turning the Virginian trains around.</DIV>
<DIV align=left>&nbsp;&nbsp;&nbsp; It was further said that on or before May 15 
a through daylight passenger service will be operated between St. Albans and 
Roanoke and observation cafe cars will be run.&nbsp; The passenger service 
between Roanoke and Norfolk is expected to be in complete operation before the 
other named.</DIV>
<DIV align=left>&nbsp;&nbsp;&nbsp; Of the new locomotives ordered by the 
Virginian, twelve of the Mikado type are due to be delivered by the Baldwin 
works on May 1; four Mallette [<EM>sic</EM>] type by the Richmond works on June 
1.&nbsp; The latter company are scheduled to deliver three heavy switch engines 
on April 25th.</DIV>
<DIV align=center>------</DIV>
<DIV align=left><FONT face=Script size=6>Gordon 
Hamilton</FONT></DIV></BODY></HTML>