<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML xmlns="http://www.w3.org/TR/REC-html40" xmlns:v =
"urn:schemas-microsoft-com:vml" xmlns:o =
"urn:schemas-microsoft-com:office:office" xmlns:w =
"urn:schemas-microsoft-com:office:word" xmlns:m =
"http://schemas.microsoft.com/office/2004/12/omml"><HEAD>
<META content="text/html; charset=iso-8859-1" http-equiv=Content-Type>
<META name=GENERATOR content="MSHTML 8.00.6001.18854">
<STYLE>@font-face {
        font-family: Tunga;
}
@font-face {
        font-family: Cambria Math;
}
@font-face {
        font-family: Calibri;
}
@font-face {
        font-family: Tahoma;
}
@font-face {
        font-family: Comic Sans MS;
}
@page Section1 {size: 8.5in 11.0in; margin: 1.0in 1.0in 1.0in 1.0in; }
P.MsoNormal {
        MARGIN: 0in 0in 0pt; FONT-FAMILY: "Times New Roman","serif"; FONT-SIZE: 12pt
}
LI.MsoNormal {
        MARGIN: 0in 0in 0pt; FONT-FAMILY: "Times New Roman","serif"; FONT-SIZE: 12pt
}
DIV.MsoNormal {
        MARGIN: 0in 0in 0pt; FONT-FAMILY: "Times New Roman","serif"; FONT-SIZE: 12pt
}
A:link {
        COLOR: blue; TEXT-DECORATION: underline; mso-style-priority: 99
}
SPAN.MsoHyperlink {
        COLOR: blue; TEXT-DECORATION: underline; mso-style-priority: 99
}
A:visited {
        COLOR: purple; TEXT-DECORATION: underline; mso-style-priority: 99
}
SPAN.MsoHyperlinkFollowed {
        COLOR: purple; TEXT-DECORATION: underline; mso-style-priority: 99
}
SPAN.EmailStyle19 {
        FONT-FAMILY: "Calibri","sans-serif"; COLOR: #1f497d; mso-style-type: personal-reply
}
.MsoChpDefault {
        FONT-SIZE: 10pt; mso-style-type: export-only
}
DIV.Section1 {
        page: Section1
}
</STYLE>
<!--[if gte mso 9]><xml>
<o:shapedefaults v:ext="edit" spidmax="1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext="edit">
<o:idmap v:ext="edit" data="1" />
</o:shapelayout></xml><![endif]--></HEAD>
<BODY lang=EN-US link=blue bgColor=white vLink=purple>
<DIV><FONT size=2 face=Arial>Ed</FONT></DIV>
<DIV><FONT size=2 face=Arial></FONT> </DIV>
<DIV><FONT size=2 face=Arial> All the Big Sandy line tunnels are single
track bores. None where ever built to handle two tracks.</FONT></DIV>
<DIV><FONT size=2 face=Arial>When they double tracked the line they just added
new single track bore beside the existing tunnel.</FONT></DIV>
<DIV><FONT size=2 face=Arial>or built a line around the tunnel.or left as a
single track tunnel</FONT></DIV>
<DIV><FONT size=2 face=Arial></FONT> </DIV>
<DIV><FONT size=2 face=Arial>Tunnel No. 1 is and always has been
single track</FONT></DIV>
<DIV><FONT size=2 face=Arial>Tunnel No. 2 One track through the tunnel one built
around. Now both go around. (Heartland Corridor)</FONT></DIV>
<DIV><FONT size=2 face=Arial>Tunnel No. 3 is and always has been
single track</FONT></DIV>
<DIV><FONT size=2 face=Arial>Tunnel No. 4 is and always has been
single track</FONT></DIV>
<DIV><FONT size=2 face=Arial>Tunnel No. 5 has two separate bores only one in use
now</FONT></DIV>
<DIV><FONT size=2 face=Arial>Tunnel No. 6 One track through the tunnel one built
around. Tunnel now abandoned</FONT></DIV>
<DIV><FONT size=2 face=Arial>Tunnel No. 7 has two separate bores only one in use
now</FONT></DIV>
<DIV><FONT size=2 face=Arial></FONT> </DIV>
<DIV><FONT size=2 face=Arial>Larry Evans</FONT></DIV>
<DIV><FONT size=2 face=Arial>Kenova, WV</FONT></DIV>
<DIV><FONT size=2 face=Arial></FONT> </DIV>
<BLOCKQUOTE
style="BORDER-LEFT: #000000 2px solid; PADDING-LEFT: 5px; PADDING-RIGHT: 0px; MARGIN-LEFT: 5px; MARGIN-RIGHT: 0px">
<DIV style="FONT: 10pt arial">----- Original Message ----- </DIV>
<DIV
style="FONT: 10pt arial; BACKGROUND: #e4e4e4; font-color: black"><B>From:</B>
<A title=nw-mailing-list@nwhs.org href="mailto:nw-mailing-list@nwhs.org">NW
Mailing List</A> </DIV>
<DIV style="FONT: 10pt arial"><B>To:</B> <A title=nw-mailing-list@nwhs.org
href="mailto:nw-mailing-list@nwhs.org">'NW Mailing List'</A> </DIV>
<DIV style="FONT: 10pt arial"><B>Sent:</B> Monday, December 14, 2009 1:15
PM</DIV>
<DIV style="FONT: 10pt arial"><B>Subject:</B> RE: N&W in 1910--Dingess
tunnel</DIV>
<DIV><BR></DIV>
<DIV class=Section1>
<P class=MsoNormal><SPAN
style="FONT-FAMILY: 'Calibri','sans-serif'; COLOR: #1f497d; FONT-SIZE: 11pt">Gordon,<o:p></o:p></SPAN></P>
<P class=MsoNormal><SPAN
style="FONT-FAMILY: 'Calibri','sans-serif'; COLOR: #1f497d; FONT-SIZE: 11pt">Is
not at least one tunnel on the Big Sandy line single track? I've not
been up US-52 since before 2002 (I took that route up and back often to visit
my parents in Columbus, OH when I lived in the Carolinas) but if
my memory serves me correctly at least one of the tunnels is single track only
never having been built with the needed clearance for a 2nd track.
??<o:p></o:p></SPAN></P>
<P class=MsoNormal><SPAN
style="FONT-FAMILY: 'Calibri','sans-serif'; COLOR: #1f497d; FONT-SIZE: 11pt"><o:p> </o:p></SPAN></P>
<P class=MsoNormal><SPAN
style="FONT-FAMILY: 'Calibri','sans-serif'; COLOR: #1f497d; FONT-SIZE: 11pt">Best
regards,<o:p></o:p></SPAN></P>
<P class=MsoNormal><SPAN
style="FONT-FAMILY: 'Calibri','sans-serif'; COLOR: #1f497d; FONT-SIZE: 11pt">Ed
Painter - Narrows, VA (living in Russellville, AR)<o:p></o:p></SPAN></P>
<P class=MsoNormal><SPAN
style="FONT-FAMILY: 'Calibri','sans-serif'; COLOR: #1f497d; FONT-SIZE: 11pt"><o:p> </o:p></SPAN></P>
<DIV>
<DIV
style="BORDER-BOTTOM: medium none; BORDER-LEFT: medium none; PADDING-BOTTOM: 0in; PADDING-LEFT: 0in; PADDING-RIGHT: 0in; BORDER-TOP: #b5c4df 1pt solid; BORDER-RIGHT: medium none; PADDING-TOP: 3pt">
<P class=MsoNormal><B><SPAN
style="FONT-FAMILY: 'Tahoma','sans-serif'; FONT-SIZE: 10pt">From:</SPAN></B><SPAN
style="FONT-FAMILY: 'Tahoma','sans-serif'; FONT-SIZE: 10pt">
nw-mailing-list-bounces@nwhs.org [mailto:nw-mailing-list-bounces@nwhs.org]
<B>On Behalf Of </B>NW Mailing List<BR><B>Sent:</B> Sunday, December 13, 2009
11:45 AM<BR><B>To:</B> 3N&W Mailing List<BR><B>Subject:</B> N&W in
1910--Dingess tunnel<o:p></o:p></SPAN></P></DIV></DIV>
<P class=MsoNormal><o:p> </o:p></P>
<DIV>
<P class=MsoNormal><SPAN style="FONT-FAMILY: Tunga; FONT-SIZE: 10pt">Bluefield
Daily Telegraph<BR>June 30, 1910</SPAN><o:p></o:p></P></DIV>
<DIV>
<P class=MsoNormal> <o:p></o:p></P></DIV>
<P style="TEXT-ALIGN: center" class=MsoNormal align=center><SPAN
style="FONT-SIZE: 13.5pt">SPEND THOUSANDS ON OLD DINGESS
TUNNEL</SPAN><o:p></o:p></P>
<P style="TEXT-ALIGN: center" class=MsoNormal
align=center>------<o:p></o:p></P>
<P style="TEXT-ALIGN: center" class=MsoNormal align=center><STRONG>Norfolk and
Western Will Preserve Twelve Pole Valley Line to Carry Back
Empties</STRONG><o:p></o:p></P>
<P class=MsoNormal> The action of the Norfolk and Western in
spending an immense sum of money in putting an arch in the Dingess tunnel from
end to end dissipates the theory not long since expressed that the old Twelve
Pole Valley Line would be abandoned.<o:p></o:p></P>
<P class=MsoNormal> For about a year contractors have been
busy on this work, and thousands of tons of brick and concrete have been
consumed in the work.<o:p></o:p></P>
<P class=MsoNormal> With the exception of a moderate
quantity of local freight and passenger traffic, the old line is now used for
the purpose of carrying empties back to the coal fields after having taken
their tonnage of coal and coke to the markets in the northwest.<o:p></o:p></P>
<P class=MsoNormal> Owing to the heavy grades and sharp
curves which abound on the Twelve Pole Line, all heavy freight trains and all
through passenger trains are run over the Big Sandy Line.<o:p></o:p></P>
<P class=MsoNormal> There is still a good quantity of timber
on the head waters of Twelve Pole and plenty of good coal. It is
believed, however, if there were neither of these commodities in evidence the
road would be preserved for the double track purposes it will now will
serve.<o:p></o:p></P>
<P style="TEXT-ALIGN: center" class=MsoNormal
align=center>------<o:p></o:p></P>
<P class=MsoNormal>[<EM>The six-mile grade of one percent or more against
loaded coal trains on the original single-track Twelve Pole mainline extended
completely through the 3327-foot-long Dingess Tunnel. The single-track
Big Sandy Low Grade Line was opened in December 1904 and was 24.20 miles
shorter than the Twelve Pole line. The N&W completed double tracking
of the Big Sandy line in 1925 and then abandoned the 54.49 miles of the
Twelve Pole line between Lenore and Wayne on September 2, 1933. The
N&W's 1933 Annual Report states, "Removal of the rails, ties and other
items of value on this line was competed in November, 1933, and 53.78 miles of
abandoned right-of-way were conveyed to the State of West Virginia for highway
purposes." For those who may have missed the links where they
were first posted here, one can experience a motorcycle ride on the state
road over the old Twelve Pole line including Dingess and Breeden tunnels by
checking out the following:</EM><o:p></o:p></P>
<P class=MsoNormal> <o:p></o:p></P>
<P class=MsoNormal> <A
href="http://www.youtube.com/watch?v=Xu7yGiS54D0">http://www.youtube.com/watch?v=Xu7yGiS54D0</A><o:p></o:p></P>
<P class=MsoNormal> <o:p></o:p></P>
<P class=MsoNormal> <A
href="http://www.youtube.com/watch?v=ONCos2I2wTY&feature=related">http://www.youtube.com/watch?v=ONCos2I2wTY&feature=related</A>]<o:p></o:p></P>
<P class=MsoNormal> <o:p></o:p></P>
<P class=MsoNormal><SPAN
style="FONT-FAMILY: 'Comic Sans MS'; FONT-SIZE: 24pt">Gordon
Hamilton</SPAN><o:p></o:p></P></DIV>
<P>
<HR>
<P></P>________________________________________<BR>NW-Mailing-List@nwhs.org<BR>To
change your subscription go
to<BR>http://list.nwhs.org/mailman/options/nw-mailing-list<BR>Browse the
NW-Mailing-List archives
at<BR>http://list.nwhs.org/pipermail/nw-mailing-list/</BLOCKQUOTE></BODY></HTML>