<font color='black' size='2' face='arial'><font size="2"><font face="Arial, Helvetica, sans-serif">Hello and Happy New Year to all.<br>
<br>
During the period when N&amp;W was providing 50/55 ton hoppers and 70 ton hoppers, How was it determined what type went to a tipple?&nbsp; Did the tipple call for cars by type?&nbsp; (eg. Tipple X needs forty 70 ton cars)&nbsp; Did the tipple expect to load x tons per day so N&amp;W just send what it had at the yard?<br>
<br>
The reason I ask is that I model a fictitious coal branch and have 55 and 70 ton cars.&nbsp; I am trying to create more operational interest.&nbsp; I have a small yard at the beginning of the branch.&nbsp; After a mine turn comes back to the yard, we sort loaded cars to either go east or west.&nbsp; I thought it might be interesting if the tipples called for mty's by type.&nbsp; Then the yard would have to sort mtys by type before a mine run.<br>
<br>
I suspect there are several different answers based on customer.&nbsp; (Such as on the Tug branch and US Steel)<br>
<br>
Thanks in advance for your input.<br>
<br>
Tom Lewis<br>
</font></font></font>