1907 - Work Nearly Completed

NW Mailing List nw-mailing-list at nwhs.org
Fri Dec 7 09:57:44 EST 2007


In a message dated 12/6/2007 10:24:21 P.M. Eastern Standard Time,
nw-mailing-list at nwhs.org writes:

The Alleghany tunnel is 5,739 feet in length, or almost a mile,


Strange ! I thought 5,280 feet made a mile. '93 track chart shows

Alleghany Tunnel to be 5,176 feet. Operator at Merrimac noted that
in the summer of '56, VGN assigned two men to tighten track bolts on
joint bars inside the tunnel. Working conditions inside the tunnel were far
superior to the outside humidity. Figuring VGN used six-punch joints,
the two-man team took two months to tighten 1593 bolts.

Harry Bundy




**************************************Check out AOL's list of 2007's hottest
products.
(http://money.aol.com/special/hot-products-2007?NCID=aoltop00030000000001)
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://six.pairlist.net/pipermail/nw-mailing-list/attachments/20071207/03ad6cea/attachment.html>


More information about the NW-Mailing-List mailing list